Package Manager

79467
  • Market related
  • Europe

Job Title: Package Manager

Client: Multi-national corporation which provides consulting, engineering, and architecture services Internationally

Assignment Type: Annually Renewable Contract

Location: Boden, Sweden

Residential/ Rotation: 4 week on office/site, one week working on remote, on rotation. Working 5 days per week, 8 hours per day

Kintec are currently partnered with a Multi-national corporation which provides consulting, engineering, and architecture services Internationally constructing a plant in Northern Sweden that will produce Green Steel - Green Steel production emits up to 95% less CO ₂  compared conventional steel production.

THE PACKAGE MANAGERS HAVE THE FOLLOWING RESPONSIBILITIES

1. Scope Definition & Documentation

  • Review and understand the scope of work for the assigned package.
  • Ensure all technical specifications, drawings and appendices are complete and aligned.
  • Identify any missing documentation or clarifications needed from engineering or CLIENT

2. Contractual Alignment

  • Verify that the scope matches the contract and appendices uploaded to Omega.
  • Flag any discrepancies or risks related to scope, quantities or responsibilities.

3. Kick-Off Meeting (KOM) Preparation

  • Prepare the  KOM agenda with package-specific topics.
  • Prepare a presentation or summary of the package scope, timeline and key interfaces etc
  • Identify critical milestones etc

4. Interface Coordination

  • Coordinate with other disciplines (civil, HVAC, instrumentation, etc.) to identify overlaps or shared responsibilities if applicable
  • Ensure routing and installation schedule are aligned across packages (especially for conduits and cables).

5. Procurement & Logistics Planning

  • Confirm material lists and delivery schedules.
  • Coordinate with procurement to ensure timely ordering and delivery.
  • Identify long lead items or potential supply chain risks.

6. Site Execution Planning

  • Review site constraints, access and storage needs.
  • Plan for winterisation measures if applicable (especially in Boden).

7. Quality & Safety

  • Define quality control checkpoints and inspection requirements with the QA team
  • Ensure safety measures by supplier where applicable
  • Coordinate with HSE for risk assessments and method statements if needed

8. Reporting & Communication

  • Receive the weekly and monthly reports in the templates sent by CIENT
  • Maintain communication with Supplier and CLIENT
  • Track and escalate issues as needed
  • Keep the weekly manufacturing progress file updated and attend the biweekly meeting

Apply for this role